Cambridge International A Level · Information Technology (9626)

系統生命週期(A Level 專屬):练习题

5 道选择题即时批改,另有 5 道文字题附完整解题步骤,全部围绕「系統生命週期(A Level 專屬)」。

10 道题目24 免费,无需注册
第 1 题
1

A company decides to replace its old IT system by running the old and new systems simultaneously for a period of time. Which implementation method is being used?

第 2 题
1

In the context of software maintenance, which type of maintenance is specifically carried out to improve the performance or maintainability of a system even if it is currently functioning correctly?

第 3 题
1

A supermarket chain implements a new inventory system by deploying it entirely at a single branch to evaluate performance, train staff, and fix issues before rolling it out to all remaining branches across the country. Which implementation method is being utilized?

第 4 题
1

Which Data Flow Diagram (DFD) symbol is correctly matched with its standard visual representation?

第 5 题
1

During the System life cycle, at which stage would a developer create a Data Flow Diagram (DFD) to represent the flow of data through the proposed system?

第 6 题
2

During the System life cycle, the final stage is evaluation. Identify the primary document, usually produced during the analysis or design phases, that the new system is measured against to determine if it has successfully met its intended objectives.

先自己写一遍答案,再对照解题步骤。

第 7 题
4

A systems analyst is designing a new database. Explain the difference between white box testing and black box testing in the context of the System life cycle.

先自己写一遍答案,再对照解题步骤。

第 8 题
5

A systems analyst is deciding between observation and document analysis during the research stage of the System life cycle. Evaluate one unique benefit of observation that document analysis cannot provide, and identify one psychological limitation associated with observation.

先自己写一遍答案,再对照解题步骤。

第 9 题
3

A company is considering the best method for transitioning from an old software system to a new one.

(a) Identify two characteristics of the parallel running implementation method.
(b) Describe one advantage and one disadvantage of using the direct changeover method compared to phased implementation.

先自己写一遍答案,再对照解题步骤。

第 10 题
5

A systems analyst has just completed the implementation of a new payroll system and is now moving into the final stages of the System life cycle.
(a) Identify two specific components that would be found in technical documentation but would be excluded from user documentation.
(b) Explain the importance of the Evaluation stage, specifically in terms of how it uses the system specification created during the design phase.

先自己写一遍答案,再对照解题步骤。

* thinka提供的内容由AI生成,可能并非总是准确或最新。请将其用作辅助资源,并与官方材料进行核实。

你已看过标准答案。现在轮到你的答案被批改。

这一页能告诉你好答案是什么样子,却无法指出你的答案缺了什么。thinka 按真实评分标准批改你的文字答案,约 15 秒完成。

想多做几道同类题目?立即开始练习这个课题,边做边批改。

立即练习